Finally, the new sidewalks are going in. This will upgrade the connectivity paths around the farm allowing for the first time, ADA compatibility of the lower side of the farm to the upper side of the farm.
This is a part of the goat barn installation which triggered sidewalk upgrades between the greenhouse, large animal pens, new goat barn, and down to the classroom. Very exciting stuff.
Are you interested in donating to the Farm’s Masterplan renovation? Consider a donation. You will find donation buttons on our website.